简体中文    |     BCRC    |     SCRC

A-Z site index

Technical Services for Construction of “Zero-waste City” in Suzhou Industrial Park

Release time:2022-06-27

The author:BCRC China

Project nameTechnical Services for Construction of Zero-waste Cityin Suzhou Industrial Park

Project duration01/01/2022/ to 1231 /2022/

Project Introduction:According to the requirements of documents such as "Work Plan for Deepening the Construction of " Zero-waste City " in the 14th Five-Year Plan Period", based on the basic situation of urban development and solid waste management in SIP, to solve the outstanding environmental problems in economic and social development in an integrated manner, to determine the construction objectives, construction tasks and expected results with the focus on bulk industrial solid waste, domestic waste and construction waste, hazardous waste and major agricultural waste, and to prepare the implementation plan for the construction of " Zero-waste  Park" in SIP in conjunction with documents such as "Construction Index System of " Zero-waste City ".